content loaded
WATTS 0002183 Image 1

WATTS 0002183-OFTWH-RM ONEFLOW ANTI-SCALE REPLCMT CARTRIDGE

MFR Part #: 0002183
SKU #: 1085434
Brand: WATTS®
UPC: 098268493894
WATTS® 0002183 Replacement Cartridge, For Use With Model OFTWH OneFlow® Anti-Scale System, Domestic
Commercial, Residential, Food Service
PROP65: This product can expose you to chemicals including lead which is known to the State of California to cause cancer and birth defects or other reproductive harm.

WATTS® Replacement Cartridge, For Use With: Model OFTWH OneFlow® Anti-Scale System, Domestic

This replacement media cartridge designed for OneFlow (R) anti-scale system, model OFTWH, provides protection from scale formation on internal and external plumbing surfaces. It is capable of treating a continuous flow rate of 6 gallons per minute at a peak flow range of 0.5 to 10 GPM. This single cartridge should be replaced once every two years for effective scale treatment. The OneFlow media has been tested and certified for material safety to NSF/ANSI Standard 42 and 61.

Product Details

WATTS® Replacement Cartridge, For Use With: Model OFTWH OneFlow® Anti-Scale System, Domestic

This replacement media cartridge designed for OneFlow (R) anti-scale system, model OFTWH, provides protection from scale formation on internal and external plumbing surfaces. It is capable of treating a continuous flow rate of 6 gallons per minute at a peak flow range of 0.5 to 10 GPM. This single cartridge should be replaced once every two years for effective scale treatment. The OneFlow media has been tested and certified for material safety to NSF/ANSI Standard 42 and 61.

Attributes

Country Of OriginUS
Domestic/ImportDomestic
Suitable For Use WithModel OFTWH OneFlow® Anti-Scale System

Features

  • Environmentally friendly
  • No backwashing or discharge water required
  • Commercial/Industrial water conditioning and RO systems
  • The wetted surface of this product contacted by consumable water contains less than 0.25% of lead by weight
  • Copper lines need to be passivized for a minimum of 4 weeks before placing unit into service